What Are the Steps to Obtain an Environmental Permit in Saudi Arabia?

ما هي خطوات الحصول على تصريح بيئي ؟

  46.png (36 KB)

What Are the Steps to Obtain an Environmental Permit in Saudi Arabia?

One of the most important requirements for obtaining an environmental permit in Saudi Arabia is submitting a certified environmental study prepared by a licensed environmental consultancy. This study must be uploaded to the Environmental Permitting Platform of the National Center

for Environmental Compliance (NCEC).

A common question we often receive from clients is:

"What are the exact steps we need to follow to prepare an approved environmental study?"
"Is there anything we should do before reaching out to an environmental consultant?"

In this post, we’ll walk you through a practical, step-by-step guide covering all the phases of preparing a compliant environmental study — from assessing your needs all the way to post-submission obligations. Whether you’re representing an industrial, agricultural, tourism, healthcare, or service project, the following breakdown applies:


Phase 1: Before Preparing the Study

1. Define the Nature and Location of the Activity

  • Identify the project’s type (industrial, medical, agricultural, etc.).

  • Pinpoint the exact location on the map.

  • Determine if the facility is existing or new.

2. Classify the Project Environmentally

  • Is the project Category 1 (Low Impact), Category 2 (Moderate Impact), or Category 3 (High Impact)?

  • Initial classification is made through a consultant, and final approval comes from NCEC.

3. Prepare the Required Documents

  • Land ownership deeds or lease agreements.

  • Municipality license or commercial registration.

  • Engineering plans or process descriptions.

  • Previous permits or approvals (if available).


Phase 2: Contracting a Licensed Environmental Consultant

1. Select an Approved Consultancy

  • Must be officially licensed by the NCEC.

  • Ensure the consultant has experience in your project’s sector.

2. Define Scope of Work and Timeline

  • Identify the appropriate type of environmental report:

    • General Environmental Commitment Form

    • Simplified Environmental Report

    • Detailed Environmental Impact Assessment (EIA)

  • Agree on tasks, responsibilities, and timeline.


Phase 3: Conducting the Environmental Study

1. Site Visits and Data Collection

  • Field visits to observe and record environmental conditions.

  • Measure air, water, noise, and soil quality depending on the project type.

2. Environmental Impact Analysis

  • Identify pollution sources and assess potential impacts.

  • Evaluate risks and effects on surrounding ecosystems.

3. Develop the Environmental Management Plan (EMP)

Including:

  • Pollution prevention and mitigation measures.

  • Emergency response planning.

  • Environmental monitoring programs.


Phase 4: Submission to the Environmental Permitting Platform

1. Create an Account on the Platform

2. Submit the Permit Application

  • Input project details, location, and consultant information.

  • Upload supporting documents.

3. Upload the Environmental Study

  • Submit the final study file.

  • NCEC conducts technical review.

  • If there are comments, revise and re-upload the study.


Phase 5: After the Environmental Permit is Issued

1. Comply with the Environmental Management Plan

  • Fully implement the approved measures.

  • Keep records of compliance and monitoring.

2. Submit Periodic Environmental Reports

  • NCEC usually requires quarterly or semi-annual reports.

  • Submit via the platform.

3. Renew the Permit on Time

  • Apply for renewal before the permit expires to ensure continued compliance.


Conclusion

Preparing an environmental study is far more than a formality — it is a strategic foundation for ensuring a project’s long-term sustainability and environmental compliance.

By following the correct sequence of steps and working with a licensed consultant, you can significantly reduce delays and streamline the process of obtaining the necessary environmental permits.


 

#EnvironmentalCompliance #EnvironmentalPermit #Sustainability #Vision2030 #GreenSaudi #EIA #EnvironmentalConsulting #EnvironmentalStudies #NCEC #SaudiArabia

46.png (36 KB)

ما هي خطوات الحصول على تصريح بيئي ؟

 

- أحد أهم شروط احصول على التصريح البيئي هو وجود دراسة بيئية استشارية معتمدة لكي ترفع إلى المركز الوطني للرقابة على الالتزام البيئي للحصول على التصريح

 

والحديث بالحديث يُذكر، كثير من عملائنا يتساءلون:

 

ما هي الخطوات الدقيقة التي نحتاجها لإعداد دراسة بيئية معتمدة؟

وهل هناك ما يجب أن نبدأ به قبل التواصل مع المستشار البيئي؟

 

 

في هذا الموضوع ، راح آخذكم في جولة عملية تقريبية عبر كامل مراحل إعداد الدراسة البيئية، من تقييم الحاجة وحتى ما بعد رفعها على منصة التراخيص البيئية. سواء كنت تمثل منشأة صناعية، سياحية، زراعية أو طبية أو غيرها ، كما يلي :

 

أولاً: ما قبل إعداد الدراسة

1. تحديد نوع النشاط وموقعه بدقة

- تحديد طبيعة المشروع أو المنشأة (طبي، صناعي، زراعي، خدمي...).

- تحديد الموقع الجغرافي على الخريطة.

- معرفة ما إذا كانت المنشأة قائمة أو جديدة.

 

2. تصنيف المشروع بيئيًا

- هل المشروع من الفئة الأولى (منخفض الأثر)، الثانية (متوسط الأثر)، أم الثالثة (مرتفع الأثر)؟

- التصنيف يتم مبدئيًا عبر استشارة مختص، ويُعتمد نهائيًا من المركز الوطني.

 

3. تجهيز المستندات الأساسية

- صكوك ملكية أو عقود الموقع.

- رخصة البلدية أو السجل التجاري.

- المخططات الهندسية / وصف العمليات.

- أي موافقات أو تصاريح سابقة (إن وجدت).

 

ثانيًا: التعاقد مع الجهة الاستشارية البيئية

1. اختيار جهة استشارية مرخصة

- يجب أن تكون الجهة معتمدة من المركز الوطني للرقابة على الالتزام البيئي.

- التأكد من خبرة الاستشاري في نوع المشروع (طبي، زراعي، صناعي، سياحي...).

 

2. الاتفاق على نطاق العمل والمدة

- تحديد نوع الدراسة المطلوبة:

- نموذج التزام بيئي

- تقرير بيئي مبسط

- دراسة تقييم أثر بيئي تفصيلية (EIA)

- الاتفاق على الجدول الزمني والمهام التفصيلية.

 

 

ثالثًا: تنفيذ الدراسة البيئية

 

1. الزيارات الميدانية وجمع البيانات

- زيارة الموقع لرصد الواقع البيئي.

- قياس جودة الهواء، المياه، الضوضاء، التربة... بحسب نوع المشروع.

 

2. تحليل الأثر البيئي المحتمل

- تحديد مصادر التلوث أو التأثير.

- تقييم المخاطر البيئية المرتبطة بالنشاط.

 

3. وضع خطة الإدارة البيئية (EMP)

تتضمن:

- إجراءات الوقاية والسيطرة على الملوثات.

- خطة الطوارئ البيئية.

- برامج المراقبة البيئية.

 

رابعًا: رفع الدراسة على منصة التراخيص

 

1. إنشاء حساب للمنشأة على منصة التراخيص

 

2. تعبئة نموذج طلب التصريح البيئي

- تحديد نوع النشاط والموقع وبيانات الجهة الاستشارية.

- رفع المرفقات المطلوبة.

 

3. رفع الدراسة ومتابعة الملاحظات

- رفع ملف الدراسة بصيغته النهائية.

- المركز يقوم بالمراجعة الفنية.

- في حال وجود ملاحظات، تتم معالجتها وإعادة الرفع.

 

 

خامسًا: بعد إصدار التصريح البيئي

1. الالتزام بخطة الإدارة البيئية

- تطبيق كافة التوصيات المعتمدة.

- الاحتفاظ بسجلات التنفيذ والمراقبة البيئية.

 

2. رفع التقارير الدورية

- المركز يطلب تقارير بيئية كل فترة (ربع سنوي أو نصف سنوي غالبًا).

- يتم رفعها عبر المنصة.

 

3. طلب تجديد التصريح عند الحاجة

- قبل انتهاء مدة التصريح، يجب التقديم للتجديد في الوقت المناسب.

 

 

خلاصة

إعداد دراسة بيئية ليس مجرد إجراء شكلي، بل هو أساس حقيقي لضمان استدامة المشروع والتزامه بمعايير البيئة في المملكة.

 

ومن خلال الترتيب السليم للمراحل، والتعامل مع جهة استشارية مرخصة، يمكن تقليص الوقت وتسريع الحصول على التصاريح اللازمة.

 

 

#الدراسات_البيئية #الامتثال_البيئي #التصريح_البيئي #الترخيص_البيئي #الاستدامة #رؤية_2030 #المملكة_الخضراء #نحو_بيئة_واعية